The
reconstruction of the large rooms was started in spring
2005. First, the electric system was renewed and two rooms
were painted. Afterwards, the roof was renewed and the faÁade
was repaired and painted. The work was done step by step
depending on the availability of funds and volunteers. Donators
for the reconstruction works were found, individuals as
well as companies..
Further
works that were necessary were the construction of a well
in the garden and the installation of waste water pipes
In
the big garden (3000 qm) a fireplace for bonfires was built,
a solar shower and a campsite came into being.
Since
July 2006, 10 bunk beds are available as well as a bathroom
and a common kitchen.
What
is planned:
The
construction of 5 combined tiled stoves is planned. This
will cost approximately 1200 € per stove since the
needed ceramic stoves are expensive.
The
baking oven that is in the parsonage is planned to be repaired
and to set into work.
The
beautiful terrace has to be repaired and reconstructed on
many places.
A
bicycle rental for guests is planned too.
What
we need in particular:
Tools for construction,
shovels, hoes, wheelbarrows, circular saws, chain saws,
electrical material, gardening tools, nails and screws,
electric scythes, outdoor and indoor paint, wood preservation
paint, painting materials
We also need
utensils for the kitchen as well as bicycles for the planned
bicycle rental.
|